The Ames Hydroelectric Generating Plant near Telluride, Colorado, became operational in 1891 as an early commercial AC system. Built by Westinghouse Electric, it powered the Gold King Mine. This event marks the first successful demonstration of long-distance transmission of industrial-grade alternating current power, using two 100 hp Westinghouse alternators.

Episodes

  1. 1890 · Ames Hydroelectric Generating PlantEquipment Installation

    Westinghouse delivered equipment in summer 1890, which was installed later that winter for the AC system.

  2. 19 June 1891 · Ames Hydroelectric Generating PlantOperational Launch

    The Ames plant became operational in June 1891, running continuously for the first 30 days to power the Gold King Mine.

Background and detail

Background. Lucien L. Nunn, a major stockholder in the Gold King Mine, sought to power a stamp mill for ore processing. The high cost of coal for steam generation drove him to seek alternative power sources. His brother Paul, an electrical engineer, investigated electric motors. They determined that a high-voltage alternating current system was more promising than existing options.

Construction. In 1890, the Nunn brothers contacted Westinghouse Electric in Pittsburgh to supply an electricity-driven system based on alternating current technology. Westinghouse delivered the equipment in the summer of 1890, and engineers installed it later that winter. The plant was constructed near Ophir, Colorado, using two large Westinghouse alternators.

Technical Significance. The plant became operational in June 1891. It was the first successful demonstration of long-distance transmission of industrial-grade alternating current power. The system used two 100 hp Westinghouse alternators, one as a generator producing 3,000 volts, 133 Hertz, single-phase AC, and the other as an AC motor. It predated the Westinghouse plant at Niagara Falls by four years, and is described as one of the oldest power plants to produce and transmit alternating current for industrial purposes.

People involved

  • Lucien L. Nunn · Major stockholder and entrepreneur who persuaded Westinghouse to engineer and finance the plant
  • Paul Nunn · Electrical engineer who investigated using electric motors to drive the plant
  • George Westinghouse · Engineer and financier who supplied the AC system and alternators

Sources

  1. Ames Hydroelectric Generating Plant Wikipedia, revision of 2026-01-06
  2. Telluride, Colorado Wikipedia, revision of 2026-10-08
  3. L. L. Nunn Wikipedia, revision of 2026-03-23