Episode 1 of 2

Equipment Installation

When
1890
Where
Ames Hydroelectric Generating Plant
Part of
First long-distance AC transmission from the Ames power plant

Westinghouse delivered equipment in summer 1890, which was installed later that winter for the AC system.

In the summer of 1890, Westinghouse delivered the equipment, and engineers installed it later that winter. The system was built around two large Westinghouse alternators. This installation preceded the operational launch in 1891.