No locationEvent

Bavarian Ludwig Railway opens with Der Adler

When
1835
Where
Nuremberg to Fürth
Episodes
2

The Bavarian Ludwig Railway, the first steam-hauled railway in Germany, opened on December 7, 1835, between Nuremberg and Fürth. The line was built by the Royal Privileged Ludwig Railway Company, which received a concession in 1834. The inaugural service was hauled by the English-built locomotive Der Adler, constructed by Stephenson in Newcastle. The event attracted a large public gathering, though King Ludwig, the railway's namesake, did not visit until August 1836.

Episodes

  1. December 7, 1835 · Nuremberg to FürthOpening of the Bavarian Ludwig Railway

    The first German steam-powered railway line opened for passenger and freight traffic before a large public gathering on December 7, 1835.

  2. December 8, 1835 · Nuremberg to FürthHorse-drawn Service Commencement

    A horse-drawn service began operating on the line from Nuremberg to Fürth once an hour starting December 8, 1835.

Background and detail

Background. Bavarian interest in railways was stimulated by reports from England and Friedrich List’s advocacy for an all-German railway system. The road between Nuremberg and Fürth was the busiest connection in the kingdom. The Royal Privileged Ludwig Railway Company received a concession to build the line on February 19, 1834, and founded a specific company for its establishment on May 14, 1833, to develop the railway.

Inauguration. On December 7, 1835, the company opened the first German steam-powered railway line for passenger and freight traffic before a large public gathering. The locomotive, named Adler, was built in Newcastle by Stephenson. Despite the railway being named after King Ludwig, he did not visit it until August 1836, as he preferred building the Ludwig Canal.

Operations. Beginning on December 8, 1835, a horse-drawn service operated on the line from Nuremberg to Fürth once an hour. The company proposed a dividend of 12 2/3%, which was met with skepticism, although the company paid a dividend of 20% in 1836.

People involved

  • King Ludwig · Namesake of the railway; unenthusiastic supporter who preferred building the Ludwig Canal
  • Stephenson · Builder of the locomotive Adler in Newcastle; described as the builder of the famous Rocket
  • Friedrich List · Advocate of an all-German railway system
  • Joseph von Baader · Sent to England by King Ludwig to study railways

Sources

  1. Bavarian Ludwig Railway Wikipedia, revision of 2026-05-14
  2. Fürth Wikipedia, revision of 2026-09-30

Machine-drafted from the cited Wikipedia passages and checked by a reviewing model, not by a human editor. Every passage cites the revision it was written from; dates and places follow those passages.