Duck Reach Power Station opens in Launceston, Tasmania

When
1895–1896
Where
Launceston
Episodes
2

The Duck Reach Power Station, completed in 1895, was the first publicly owned hydroelectric plant in the Southern Hemisphere. Located in Launceston, it supplied power to the city via a weir on the South Esk River. The station operated until 1955 and is now a museum within the Cataract Gorge Reserve.

Episodes

  1. 10 December 1895 · LauncestonTrial Illumination

    The station operated on a trial basis in December 1895, illuminating Launceston streets with arc lights.

  2. 1 February 1896 · LauncestonOfficial Switch-On

    The hydroelectric power system was officially switched on in February 1896.

Background and detail

Background. The Duck Reach Power Station was the first publicly-owned hydroelectric power station in the Southern Hemisphere. Completed in 1895, the conventional plant provided power to Launceston, in northern Tasmania, Australia. The facility was formed by the Duck Reach Weir across the South Esk River and a diversionary penstock.

Operations. The power station operated on a trial basis on the evening of 10 December 1895, illuminating some of Launceston's streets using arc lights. On 1 February 1896, the hydroelectric power system was officially switched on. The station remained in operation until 1955, serving as a key infrastructure for the city.

Legacy. The former power station is now a museum located within the Cataract Gorge Reserve, listed on the Tasmanian Heritage Register. In 1995, on the centenary of its opening, the building was re-opened as a technology museum. One of the original 1895 Siemens dynamos is preserved and on display.