EuropeEvent

All Saints' Church, Wittenberg begun

When
1490
Where
Wittenberg
Episodes
1

Construction of All Saints' Church in Wittenberg began in 1490 under the direction of architect Conrad Pflüger, commissioned by Elector Frederick III the Wise during the rebuilding of the Ascanian fortress.

Episodes

  1. 1490 · WittenbergStart of Construction

    Construction of the new All Saints' Church commenced in 1490 as part of the fortress rebuilding project.

Background and detail

Architectural Development. The church was designed by Conrad Pflüger and erected between 1490 and 1511. The structure was built in the Late Gothic style, marking a significant architectural addition to the Wittenberg castle grounds during the Wettin period.

People involved

Sources

  1. All Saints' Church, Wittenberg Wikipedia, revision of 2026-07-24

Machine-drafted from the cited Wikipedia passages and checked by a reviewing model, not by a human editor. Every passage cites the revision it was written from; dates and places follow those passages.