Episode 3 of 3
First Day of Instruction
- When
- 1 October 1883
- Where
- Castlereagh Street building
Instruction began for 46 boys on 1 October 1883 in a Castlereagh Street building designed by Francis Greenway.
The first day of instruction for Sydney Boys High School took place on 1 October 1883. Forty-six boys attended classes in a building on Castlereagh Street, which had been designed by Francis Greenway and constructed by convicts. This marked the operational start of the school.
Sources
- Sydney Boys High School Wikipedia, revision of 2026-09-29
Machine-drafted from the cited Wikipedia passages and checked by a reviewing model, not by a human editor. Every passage cites the revision it was written from; dates and places follow those passages.