Episode 2 of 2

Atlantic Passage

When
18 August 1833 to September 1833
Where
Atlantic Ocean
Part of
SS Royal William crosses the Atlantic largely under steam

The ship completed a 25-day Atlantic crossing, largely under steam power, arriving in Gravesend.

The 1,370-ton vessel made a 25-day passage across the Atlantic Ocean, arriving at Gravesend on the River Thames. The journey included a stop at Cowes, Isle of Wight, for a fresh coat of paint.

Sources

  1. SS Royal William Wikipedia, revision of 2026-03-24

Machine-drafted from the cited Wikipedia passages and checked by a reviewing model, not by a human editor. Every passage cites the revision it was written from; dates and places follow those passages.