Episode 3 of 3
Bridge Completion
- When
- 7 February 1899
- Where
- Tsavo River bridge site
The Tsavo railway bridge was completed on 7 February 1899 after the threat was eliminated.
With the man-eater threat eliminated, the workforce returned to Tsavo. The bridge construction resumed, and the bridge was completed on 7 February 1899.
Sources
- John Henry Patterson (author) Wikipedia, revision of 2026-08-10
- Tsavo Man-Eaters Wikipedia, revision of 2026-10-11
Machine-drafted from the cited Wikipedia passages and checked by a reviewing model, not by a human editor. Every passage cites the revision it was written from; dates and places follow those passages.