Episode 1 of 1

Canal Completion

When
1848
Where
LaSalle-Peru
Part of
Illinois and Michigan Canal completed

The Illinois and Michigan Canal was completed in 1848, connecting the Great Lakes to the Mississippi River.

The canal was finished in 1848 at a cost of $6,170,226. It ran 96 miles from the Chicago River to the Illinois River at LaSalle-Peru, crossing the Chicago Portage.

Sources

  1. Illinois and Michigan Canal Wikipedia, revision of 2026-09-21

Machine-drafted from the cited Wikipedia passages and checked by a reviewing model, not by a human editor. Every passage cites the revision it was written from; dates and places follow those passages.