Episode 1 of 2
Start of Covering Works
- When
- 13 February 1867
- Where
- Brussels
The massive covering operation began on 13 February 1867, involving thousands of workers to vault the river.
The gigantic work began on 13 February 1867. The river was temporarily diverted, and much of the old city centre was opened up. This operation absorbed two-thirds of the public subsidies, totaling 18 million Belgian francs.
Sources
- Covering of the Senne Wikipedia, revision of 2026-06-16
Machine-drafted from the cited Wikipedia passages and checked by a reviewing model, not by a human editor. Every passage cites the revision it was written from; dates and places follow those passages.