In 1889, the Willamette Falls and Locks Company granted industrial firms building sites and water withdrawal rights along the canal.

The company granted Willamette Pulp and Paper Co and Crown Paper Co building sites along the canal and rights to withdraw water for industrial purposes. This event occurred in 1889, but the passages do not mention electric power transmission or a generator. The legacy claim of an electric line is not supported by this passage.

Sources

  1. Willamette Falls Locks Wikipedia, revision of 2026-10-05

Machine-drafted from the cited Wikipedia passages and checked by a reviewing model, not by a human editor. Every passage cites the revision it was written from; dates and places follow those passages.